Members of the Marathon companies took a visit to a local rooftop job site to help start the instillation process. This site was located at 899 Main St. in Buffalo, NY. This project utilized our MRP Supports products that included 250 Cumaru wood deck tiles & 350 PR2 pedestals. This is a building renovation that will include office spaces and a patio section that all members of the building can enjoy.
Marathon’s Eterno Support system is very easy to use. It saves time to be able to adjust the height of the pedestal after the paver is in place. The folks at MRP were very helpful. I would use this product on our next pedestal paver system.
— Dan Baker, President, AB Construction and Roofing, Inc.